Scope limits: Sample run
We can help write the sample-run request: dough hydration, piece weight, working width, lane count, and the destination of trim. We cannot run the dough ourselves and we cannot certify that a factory’s demonstration dough matches the bakery’s recipe. If the supplier refuses the buyer’s dough, that fact belongs on the comparison sheet.
Site readiness
We list utilities and footprint questions: three-phase supply, connected load, compressed air, cooling water, PLC interface and access for tool withdrawal. Civil works, sanitation drains and building permits stay with the owner. This intermediary does not install equipment or sign electrical certificates.